Air Pollution Control District Proposed Permit

January 20, 2021

Notice of Public Comment Period on a Title V Construction Permit

The Louisville Metro Air Pollution Control District (District) proposes to issue a construction permit to Louisville Medical Center Steam Plant (steam and chilled water service provider), 235 Abraham Flexner Way, in accordance with Regulation 2.03. This permit is being issued to install a temporary natural gas-fired boiler with low NOx burner during the transition from coal to natural gas boilers. The 30-day public comment period starts on January 23, 2021, and ends on February 22, 2021.

Written comments will be accepted at [email protected] until midnight or mailed to the District office, 701 West Ormsby Avenue, Suite 303, Louisville, KY 40203, by February 22, 2021.

Drafts of the permit and summary are available by calling Matt King at (502) 574-6000 or emailing [email protected] or at the following website: http://www.louisvilleky.gov/APCD/docket.  Materials are not available at the District office due to the COVID-19 restrictions.

To be published on January 22, 2021, in The Courier-Journal Metro edition, 14 Public Notices column.

Enter your address and MyLouisville will find nearby city services in the following categories:

  • Garbage Icon Solid Waste Services
  • Police Badge Icon Emergency Services
  • Political Info Icon Political Info
  • House Icon General Location Info

Find your garbage, recycling, yard waste and large-item set-out dates. Sign up for large-item set out and street sweeping reminders by email and text!

The new Metro311 Reporting System and our new 311 mobile app is live!

Report Something to Us!

Louisville Metro 311 App icon
Call MetroCall at 311 or (502) 574-5000

No service has been selected.

No form has been selected.