Lexington Road Safety Improvements (Grinstead to Alta Vista)

District 5 of the Kentucky Transportation Cabinet (KYTC) is considering changes to the existing traffic pattern along Lexington Road from Grinstead Drive to Alta Vista Road. A substantial section of the roadway is currently closed due to a a Louisville Water Company project. Upon reopening, the road is proposed to be reconfigured from 4 lanes (2 in each direction) to 3 lanes (1 in each direction and 1 center turn lane.) This project will extend the reconfiguration project along Lexington Road from Payne Street to Grinstead Drive. 

Click here to view the proposed renderings of the project

Due to the COVID-19 Pandemic and the necessity to minimize in-person engagements, all comments will only be accepted through the online portal below. The previously scheduled public meeting has been cancelled. If you have specific questions please call 502-574-0032.