On-Street Projects

4th Street Viaduct - Click here to see the project description

Between Industry Rd and Greek Way under the railroad tracks

Description: Safety Improvement Project

 

Barret and Castlewood - Completed

Barret From Winter to Castlewood

Castlewood From Barret to Baxter

Description: Safety Improvement Project

 

4th Street - Completed

See the ride here: 4th St Northbound and 4th St Southbound

From: Main to the Belle of Louisville

Direction: North/South

Description: Re-Striping Project

 

Belle of Louisville - Completed

See the ride here: Eastbound Belle of Louisville and Westbound Belle of Louisville

To/From: Along the Belle of Louisville loading area

Direction: East/West

Description: Re-Striping Project

 

West Jefferson - click to view plans - Completed

See the ride here: Eastbound West Jefferson and Westbound West Jefferson

From: 13th St. to 26th St.

1 or 2 way: Two way

Direction: East/West

Description: Re-Striping Project

 

Hill St - click to view plans - Completed

See the ride here: Westbound Hill St and Eastbound Hill St

From: 2nd St. to E. Hill St and E. Burnett to Meriwether

1 or 2 way: Two way

Direction: East/West

Description: Re-Striping Project

 

4th Street Posts - Completed
Length: 0.1 miles

From: Under the viaduct on 4th near University of Louisville

1 or 2 way: two way

Direction: North/South

Description: Installation of flexible delineator posts between the travel and bike lanes.

4th St Posts


Nanz Neighborway - Completed

Length: 2.3 miles

From: Seneca Loop

To: Westport Road

1 or 2 way: two way

Direction: East/West

Description: The addition of shared lane markings connecting the new Seneca Park Loop to where the bike lanes start/end on Westport Road. 

Nanz Neighborway


Nanz Traffic Circles - Completed

Length: N/A

From: Lola

To: Macon Avenue

1 or 2 way: two way

Direction: East/West

Description: The addition of two traffic circles along the Nanz neighborway. 

Nanz Traffic Circle


Kentucky Street and Breckinridge Street - Completed

Length: 1 mile

From: Barret Ave 

To: 8th St

1 or 2 way: both one way

Direction: East/West

Description: Bike lane intersection updates. Encourages motorists to make left turns from the designated mixing zone area where bike lane ends and mixing zone begins (175 ft from intersection).

Breck and Ky St Turning


Kentucky - Completed

Length: N/A

From: Shleby St

To: Logan St

1 or 2 way: one way

Direction: East

Description: Addition of delineator posts to further guide motorists in direction of travel. 

Posts at Shelby


Muhammad Ali Blvd - Completed

Length: 1 mile

From: 6th St

To: 13th St

1 or 2 way: one way

Direction: West

Description: Addition of a door zone buffer bike lane (5ft bike lane, 2 ft buffer). 

Ali Bike Lane


Chestnut St - Completed

Length: 1 mile

From: 13th St

To: 6th St

1 or 2 way: one way

Direction: East

Description: Addition of a door zone buffer bike lane (5ft bike lane, 2 ft buffer). 


6th St - Completed

Length: 1 mile

From: River Rd

To: Kentucky St

1 or 2 way: one way

Direction: South

Description: Bike facility consists of shared markings, separated bike lane and double buffer bike lane. 


Payne St - Completed

Length: 1.2 miles

From: Lexington

To: Ewing Ave

1 or 2 way: two way

Direction: East/West

Description: Shared lane markings


Jefferson St - In Progress

Length: 0.8 miles

From: Floyd St

To: 8th St

1 or 2 way: one way

Direction: West

Description: Currently being evaluated for best possible bike facility. 


St. Mathews Phase 2 - Completed

Length: 9.9 miles | Click here to view a map.

To and From:

Bauer Ave from Frankfort Ave to Wilmington Ave
Wilmington Ave from Bauer Ave to Macon Ave
Macon Ave from Wilmington Ave to Hillsboro Rd
Hillsboro Rd from Macon to S Sherrin Ave
S Sherrian Ave from Hillsboro Rd to Alton Rd
Alton Rd from S Sherrian Ave to Monohan Dr
Monohan Dr from Alton Rd to Norbourne Blvd
Norbourne Blvd from Monohan Dr to Macon Ave
Meridian Ave from Willis Ave to Nanz Ave
Nanz Ave from Wiltshire Ave to S Sherrin Ave
S Sherrin Ave from Nanz Ave to Alton Rd

1 or 2 way: two way

Description: Neighborway consisting of shared lane markings. There are a number of traffic calming improvements that exist along this neighborway. 


Liberty - In Progress

Length: 0.3 miles

From: 9th St

To: 6th St

1 or 2 way: one way

Direction: East

Description: Addition of a door zone buffer bike lane (5ft bike lane, 2 ft buffer).


12th and 13th - Completed

Length: 2.2 miles

From: Rowen

To: Hill

1 or 2 way: two way

Direction: North/South

Description: The proposed bike facility consists of shared lane markings and buffered biked lanes. 


Delor/Pindell/Thruston - Completed

Length: 1.2 miles

From: Hickory

To: Audubon Pkwy

1 or 2 way: two way

Direction: North/South

Description: Neighborway consisting of shared lane markings. There are a number of traffic calming improvements that exist along this neighborway. 


W Kentucky St - Completed

Length: 0.5 miles

From: 8th St

To: 15th St

1 or 2 way: two way

Direction: East/West

Description: The proposed bike facility consists of bike lanes and buffered biked lanes. 

 

Castlewood Ave

Length: 0.3 miles

From: Barret

To: Baxter

1 or 2 way: two way

Direction: East/West

Description: Currently being evaluated for roadway improvements.

AttachmentSize
PDF iconHERE.pdf2.26 MB

to see the 2015 proposed plans   


 

Spring St - Completed

Length: 0.7 miles

From: Cabel St

To: Payne St

1 or 2 way: two way

Direction: 1.4 miles

Description: Updating current bike facility to national standards.