Lexington Road Safety Project

Louisville Metro is implementing a roadway design reconfiguration to improve safety on Lexington Road. This project is based on recommendations from the Lexington Road Corridor Transportation Plan that was created in 2015.
 
The first phase of this road reconfiguration, from Payne Street to Grinstead Dr, was completed in 2017, and the second phase, from Grinstead Dr to Stilz Ave, was completed in 2020.
 
While Louisville Metro and KYTC continue to monitor the results of this road reconfiguration, initial data shows improved safety for users of all modes of transportation. 
 
 

 

Enter your address and MyLouisville will find nearby city services in the following categories:

  • Garbage Icon Solid Waste Services
  • Police Badge Icon Emergency Services
  • Political Info Icon Political Info
  • House Icon General Location Info

Find your garbage, recycling, yard waste and large-item set-out dates. Sign up for large-item set out and street sweeping reminders by email and text!

The new Metro311 Reporting System and our new 311 mobile app is live!

Report Something to Us!



Call MetroCall at 311 or (502) 574-5000

No service has been selected.

No form has been selected.